Book review

The building DB-LK, mostly completed by September 1, 1939 for testing aircraft was transported to the airfield Chkalovsky Air Force Research Institute in which it was collected, we conducted testing of the control and equipment. taxiing and trial runs began in November. It should be noted that in 1934-36. scheme "flying wing" pilots aroused genuine interest and even curiosity. However, the tests of such devices, particularly aircrafts Kalinin K-12 and Beach 14 Cheranovskii, did not bring satisfaction and interest in the "wing" has decreased significantly. DB-LK appeared precisely during disappointments, so did not cause any enthusiasm or surprise. According to the memoirs of test pilot PM Stefanovsky, Testing Institute staff is very skeptical about the emergence of on the tarmac Belyaeva aircraft and christened it "chicken."

Inside Flash 5 [With CDROM] by Jody Keating

Page Updated:
Book Views: 11

Author
Jody Keating
Publisher
Date of release
Pages
0
ISBN
9780735711051
Binding
Illustrations
Format for Download
PDF, EPUB, MOBI, TXT, DOC
Rating
3
70

Advertising

Get eBOOK
Inside Flash 5 [With CDROM]

Find and Read eBook

Click one of share button to proceed download:
Choose server for download:
Download
Get It!
File size:4 mb
Estimated time:1 min
If not downloading or you getting an error:
  • Try another server.
  • Try to reload page — press F5 on keyboard.
  • Clear browser cache.
  • Clear browser cookies.
  • Try other browser.
  • If you still getting an error — please contact us and we will fix this error ASAP.
Sorry for inconvenience!
For authors or copyright holders
Amazon Affiliate

Go to Removal form

Leave a comment


Readers reviews